What's Inside a Portable Earthing Set — and What the Quotation Should List

November 18, 2026 6 min readGrounding & Earthing

Five parts, one of which half the quotations leave out. What decides the conductor, the clamp and the rod, why personal grounding leads are a different product, and what to tick off when the crate lands.

Ask five suppliers what a portable earthing set contains and you get five lists. Four of them are roughly the same list in a different order. The fifth is a set of grounding leads with clamps and no rod — a real product, sold to do a different job.

The confusion is not about the equipment. It is about the word set. IEC 61230 describes the equipment as portable equipment for earthing or earthing and short-circuiting, and its second edition allows the components to be bought separately against the standard. So a bag of clamps and a complete assembly can both be compliant. Only one of them does the job on its own.

1. The five parts — and there is no sixth

A complete set for a three-phase point of work is: three phase conductors, one earth conductor, a clamp on each conductor, an earth rod where there is no earthed metal within reach, and an insulating operating rod to put the whole thing on with.

The standard describes that object from the outside rather than as a bill of materials. Its scope covers portable equipment, with or without a matching fixed connection point, for isolated installations, a.c. and d.c., overhead or underground, low voltage or high voltage, for temporary earthing or for earthing and short-circuiting. That breadth is the point: the same family has to serve a substation bay, a cable termination and a rail.

It also does not insist on the rod. Where the station earth or a fixed earthing point is within reach of the conductor, the earth lead lands there and the rod stays in the bag. That is why two sets of the same rating can look so different in the crate, and why the enquiry has to say which arrangement you have.

PartWhat actually decides itWhat goes wrong when it is decided by habit
Phase and earth conductorsProspective fault current at the point of work, and the clearing time of the protection upstreamConductor chosen by installation voltage. It fits, it looks right, and it is the wrong thermal duty
ClampsThe fitting you land on: busbar, cable lug, tubular conductor, rail web, terminal studA jaw opening that looks generous on paper but will not seat on the actual lug
Earth rodWhether earthed metal is within reach, and where you can stand to apply itRod too short to reach the earth point, or so long it takes two people to place
Operating rodHeight of the attachment point above where the operator can standThe operator ends up inside the flash boundary to make the last 400 mm
Everything geometricInstallation voltageA set ordered against a voltage class it is never actually used at
What decides each part, and what goes wrong when it is decided by habit

2. Two parts are decided by the fitting, not by the voltage

Clamps and rods are the pair that catches people out. Voltage tells you how much insulation the operating rod has to provide. It tells you nothing about the shape of what the clamp has to bite.

A spiral clamp wants a round conductor it can wind onto. An alligator clip wants a flat lug or a small terminal. A busbar clamp wants parallel faces and enough throat depth to clear the bar plus the insulation behind it. On rail, the fitting is a web and the clamp is a different product again — which is why a catenary set is quoted with its own rail clamp rather than a substation clamp.

The practical test is a photograph. A picture of the point of work, taken from where the operator will stand, settles the clamp, the rod length and the rod type in one go. It is faster than any description, and it is the difference between a quotation that fits and one that comes back.

3. Personal leads are not a small set

There is a second family that looks like a set and is not one. The personal security grounding wire, and the auxiliary personal safety grounding lead used at 0.4 kV and 10 kV, both protect the individual at the point of work. Neither replaces the set that is applied to the isolated section before anyone starts.

They are quoted for a different purpose, sized for a different duty, and used in a different order in the switching sequence. A requisition that says only earthing for the team can mean either, and the quotation will land on whichever one the supplier sells more of.

4. What the quotation has to itemise

A quotation that says earthing set, complete, one off, is not a quotation. It is a placeholder. These are the lines that have to be written out:

  1. 1How many phase conductors, and whether the earth lead is included or counted separately.
  2. 2Conductor cross-section and length per lead. Copper is not a specification. The medium is limited to copper cables, copper bars or aluminium bars, and the cable itself sits under IEC 61138, so the section and the length belong on the line.
  3. 3Clamp type, named against the fitting. One line per connection point, not one line for the set.
  4. 4How the earth side terminates. Station earth, a fixed earthing point, or a rod — and if a rod, its length.
  5. 5Operating rod: length, and single or two-section. This is where the reach argument gets settled before goods leave, not on site.
  6. 6Complete set or components. The second edition allows either. The two quotations differ by a lot, and the lower one is not automatically the better deal.
  7. 7Documentation. What arrives with the equipment, in the form your own customer or auditor expects to see it.

5. The two numbers that actually size the conductors

IEC 61230 bases performance on the electro-dynamic and electro-thermal effects acting during a short circuit, and expresses withstand capability as rated current, rated time and peak factor. There is no rated voltage anywhere in that list.

The geometrical dimensions of a set relate to the voltage of the installation. The rating does not. A set described as a 110 kV earthing set is a set whose dimensions suit 110 kV work — it is not rated at 110 kV, and nothing about the number tells you what fault current it survives.

So the two figures to send with an enquiry are the prospective fault current at the point of work and the clearing time of the protection upstream of it. Every other line on the quotation can be corrected after a conversation. Those two cannot be guessed, and a supplier who quotes without them is quoting a shape rather than a duty.

6. What to check when the crate lands

  • Count against the quotation, not against the photograph. Phase leads, earth lead, clamps, rod, operating rod — five lines to tick.
  • Trial-fit every clamp on the real fitting. A sample clamp on a sample bar proves nothing about the lug in the switchgear you actually own.
  • Read the marking on the conductor and the ferrules. Section, and the joint at each end, are the two places a short-circuit duty fails first.
  • Check the operating rod joint locks under load, not just by hand on the bench.
  • Confirm the documentation matches what was ordered — the routine failure on earthing equipment is the fitting, not the cable, and the paperwork is what the auditor asks for first.

Full range, with conductor sections and clamp types on each page: Earthing Kits & Grounding Sets. The set most enquiries settle on is the 0.4–500 kV short-circuit earthing set with earth rod; if the point of work has no rod position, the portable earthing wire set with spiral and alligator clamps is the part-by-part alternative, and the personal security grounding wire 35–1000 kV covers the individual, not the section.

Checking a quotation for an earthing set?

Send a photograph of the point of work, the prospective fault current and the clearing time. We will come back with the conductor section, the clamp type and the rod length for that point, itemised line by line so it can be checked against the requisition.

Send the worksite details
Start Your Project

Let's build your power infrastructure together

Send us your specifications — insulating mats, gloves, voltage detectors, grounding systems or safety tooling projects. Our engineers respond within 24 hours with technical recommendations and pricing.