Class sets the voltage band and the thickness window, but it is the yearly test that separates the classes commercially: Class 0 needs a visual check, Class 4 goes back on a 40 kV set.
Most matting enquiries arrive as a voltage. Somebody writes "we need matting for 11 kV switchgear" and stops there. The number is a fine starting point, but on its own it does not tell you which mat you get, because IEC 61111 sorts matting by class first and lets thickness follow.
Here is the ladder, both test levels, and the part that costs money every year.
1. The ladder, with both test levels
| Class | Max use AC | AC proof test | Withstand test | Recommended thickness | Max thickness |
|---|---|---|---|---|---|
| 0 | 1.0 kV | 5.0 kV | 10.0 kV | 2.0 mm | 6 mm |
| 1 | 7.5 kV | 10.0 kV | 20.0 kV | 2.0 mm | 6 mm |
| 2 | 17.0 kV | 20.0 kV | 30.0 kV | 3.0 mm | 8 mm |
| 3 | 26.5 kV | 30.0 kV | 40.0 kV | 4.0 mm | 11 mm |
| 4 | 36.0 kV | 40.0 kV | 50.0 kV | 5.0 mm | 14 mm |
Read the last two columns as a range, not a recipe. Class 2 accepts anything from 3 mm up to 8 mm. Class 4 accepts 5 mm up to 14 mm. A 6 mm mat and an 11 mm mat can both be Class 3 and both be conforming.
2. Class decides the voltage. Thickness only has to land inside the window
This is the sentence that saves money on a tender: the class carries the voltage rating, and the thickness has to fall inside that class's window. Thickness is not a second dial that raises the rating. A thicker mat is not automatically a higher class, and a class cannot be inferred from a calliper reading.
Two manufacturers prove the point from opposite directions. One lists Class 3 at 3 mm; another recommends 4 mm for the same class. Both are following the standard, because the standard fixes the window rather than one number.
If your specification says "5 mm, 10 kV", check whether the two numbers came from the same table. Very often they did not. I have written about that mismatch separately — why thickness does not map to voltage — so I will not repeat it here. Just note that a class-based spec and a thickness-based spec can name two different products.
3. The DC figure is 1.5× — and you still should not do the arithmetic
Every class a manufacturer publishes with a DC rating sits at exactly 1.5 times its AC rating:
| Class | Max use AC | Max use DC |
|---|---|---|
| 0 | 1.0 kV | 1.5 kV |
| 3 | 26.5 kV | 39.75 kV |
| 4 | 36.0 kV | 54.0 kV |
The ratio is clean, which tempts people to multiply. Do not multiply. Order and mark by the class, and let the DC figure be the one the mat was tested and labelled against. The 1.5× is a published consequence of the class, not a conversion factor you are entitled to apply to a mat that was never given a DC rating in the first place.
4. The yearly test is where the classes really differ
This is the part procurement tends to discover a year late. Any insulating mat that has gone 12 months unused — sitting in the store counts — has to be checked before it goes into service. What that check involves depends on the class:
| Class | Test after 12 months unused | Duration |
|---|---|---|
| 0 | Visual inspection only | — |
| 1 | 10 kV | 1 minute |
| 2 | 20 kV | 1 minute |
| 3 | 30 kV | 1 minute |
| 4 | 40 kV | 1 minute |
A Class 0 mat never has to leave the building. A Class 4 mat has to go onto a 40 kV set every single year, and the lab that can do it is not always the one down the road.
That changes the economics of a mixed store. If a bay only ever sees 3 kV, a Class 4 mat bought "for headroom" adds a 40 kV annual test to the maintenance calendar for the life of the mat. Buy the class the voltage asks for, and let the higher classes stay in the compartments that need them.
5. The colour marks the symbol, not the class
Class is carried by a coloured double triangle: Class 0 red, Class 1 white, Class 2 yellow, Class 3 green, Class 4 orange.
Two things follow. First, colour alone is not evidence of class — a mat that has been in a diesel-heavy room for six years may not read as green any more. Second, the marking is the evidence: manufacturer identification, the live-working double triangle, the IEC 61111 reference, month and year of manufacture, the category where applicable, and the class code.
On rolls, the marking repeats along the length. One manufacturer's instructions put the repeat interval at 400 mm; other sources describe it as at least once per metre. Either way, a cut length should carry the marking — if a section has been trimmed between marks, treat the class of that section as unproven until it is tested.
6. Two editions are both still in the field
IEC 61111:2009 is the second edition, and it is what most datasheets and most tender documents still quote. IEC 61111:2026 is the third edition, and it cancels and replaces the 2009 text.
So a specification that says "to IEC 61111" can mean either one. Ask which. The edition question, and the regional adoptions that sit on top of it — the Canadian ULC version is a modified adoption, not an identical one — are covered in the editions and regional adoption guide.
7. What to put on the enquiry
- 1The class, if you know it. If you only know the system voltage, give that plus the location and I will map it.
- 2Whether you need rolls or cut sheets, and the dimensions. A 1 m × 10 m roll is a different line item from a 1 m × 1 m tile.
- 3The thickness, but only if you actually have a requirement. Otherwise leave it to the class window — specifying a thickness you do not need has cost people money on both the earlier and the later end.
- 4Whether the mat will sit indoors, outdoors, or in an electronics area. An ESD floor is a different product from a switchroom mat, and the two do not substitute.
- 5Whether you need the unused-stock test documented at delivery, which is worth agreeing before the order rather than a year after it.
Most of these are answered on the matting pages themselves: the IEC 61111 matting range, the switchroom and anti-slip line, and the 35 kV high-protection mat. If you would rather just send the switchgear schedule and let me pick, that works too — the class table above is the whole decision.
Need this confirmed against your own installation?
Send us the network voltage, the standard you are specifying against and the ambient conditions. Our engineers will confirm the class, thickness and test report, and reply with lead time.
Ask a technical question