
Insulated Saw Knife for Live-Line Tree Pruning
Insulated pruning saw knife with an extended blade, for live-line vegetation clearing on 10 kV to 500 kV overhead lines.
Final quotation depends on specification, quantity and destination — request a quote for exact pricing.
- Model Number
- YJH-YDGD type
- Voltage Range
- 10 kV to 500 kV
- Application
- Electricity and telecommunications
- Brand Name
- YJH POWER
- Place of Origin
- Hebei, China
Product Attributes
| Model Number | YJH-YDGD type |
| Voltage Range | 10 kV to 500 kV |
| Application | Electricity and telecommunications |
| Brand Name | YJH POWER |
| Place of Origin | Hebei, China |
Description











Ask about Insulated Saw Knife for Live-Line Tree Pruning
Send the quantity, the voltage class or size, and the standards your project calls for. Our export engineers reply within 24 hours with a quotation, lead time, and the test certificates available with the order.
- Quotation and lead time within 24 hours, Mon–Sat
- Test certificates supplied with the order
- Factory direct — HEBEI YUJINHONG TECHNOLOGY CO., LTD.
Request a quote for this product
Goes straight to our export engineers with the model already noted — saw-knife-insulated-live-line-pruning
Related Products
View all Insulating Tools, Ladders & DetectorsStill deciding? Read the engineering guide
Background on how this product's class, dimensions and test requirements are determined.
Specifying a Voltage Detector: What IEC 61243-1 Covers, and What Your Switching Rules Cover
Two different questions get answered with the same three words. What the IEC 61243-1 text actually covers, why the pre-use proof test comes from your operating rules rather than the standard, and how to write a specification that keeps the two clauses apart.
Read the guide Insulation & Standards · 5 min readInsulating Ladders for Live Working: What IEC 61478 Is, and What It Is Not
IEC 61478 covers ladders of insulating material for live working — and its scope stops there. What the scope wording admits, why mobile insulating platforms are outside it, and what to put in the tender instead.
Read the guideLet's build your power infrastructure together
Send us your specifications — insulating mats, gloves, voltage detectors, grounding systems or safety tooling projects. Our engineers respond within 24 hours with technical recommendations and pricing.




