How to verify the test report that comes with the goods
A certificate is worth what you can check on it. The useful distinction is between a report that belongs to the goods in front of you and one that only describes the design.
Batch report versus type test
A batch dielectric test report ships with the goods, so the report matches the batch you received rather than the type. That is the document that answers "is this the material we tested" — the batch number on the report should be the batch number on the packing list.
A type test describes a design and is not repeated for every production run. Both have their place, but they answer different questions, and a project that requires proof of the delivered goods is asking for the first one.
What to check on the report
Six fields carry the weight: the product and the standard it is tested against, the batch number, the test voltage and duration, the result, the date and the issuing laboratory. If the report is issued to a named inspector or a specific standard, that has to be agreed before production — it cannot be added afterwards.
- Product and standard named on the report
- Batch number matching the packing list
- Test voltage and duration stated, not just "passed"
- Result, test date and issuing laboratory
- Report addressed to the party the project requires
- Language the receiving inspector can read
When a third-party report is needed
Third-party testing through SGS or TUV can be arranged on request. It sits at the end of the production schedule, which is why it is agreed at the quotation stage rather than after packing.
If a project requires a certificate we do not hold, we say so at that stage. Sending a document that belongs to another product line is worse than a gap in the submission — the gap can be planned around.
Audits and pre-shipment inspection
Factory audits and pre-shipment inspection by video are accepted, and a video walk-through can be arranged against the order once the goods are packed. Tell us the checklist your auditor will work to before the audit is booked, so the records and the batch test reports they will ask for are ready on the day.
Where the goods are made
In Hebei, China, in our own plant. The site covers 1,200,000 m² with 80,000 m² of building area and seven production lines. Country of origin is declared as Hebei, China on the shipping documents.
Enquiry checklist (A4, one page)
Ten fields, one page: product type, class or maximum service voltage, size, quantity, destination, trade term, documents, inspection and date. Fill it in and send it back — the quotation comes with price, MOQ, lead time and packing.
Download the checklist (PDF)Asked on this subject
- Does the report match the goods I receive, or the product type?
- The batch dielectric test report ships with the goods and matches the batch in the shipment. Compare the batch number on the report with the one on the packing list — if they disagree, that is the moment to raise it, not after installation.
- Can the report be issued to our inspector or to a named standard?
- Yes, when it is agreed at the quotation stage. It cannot be added once production is finished, because the testing and the paperwork both run at the end of the schedule.
- Can we inspect before shipment?
- Yes. Factory audits and pre-shipment inspection by video are accepted. Send the checklist in advance so the records your auditor will ask for are ready on the day.
Let's build your power infrastructure together
Send us your specifications — insulating mats, gloves, voltage detectors, grounding systems or safety tooling projects. Our engineers respond within 24 hours with technical recommendations and pricing.
