Lead time & shipping

Lead time, trade terms and how the goods are packed

A lead time is only useful if you know which clock it measures. Ours starts at order confirmation, not at the enquiry, and the band depends on the quantity and on how much of the order is made to your specification.

Home/Lead time & shipping

The clock starts at confirmation

Between 10 and 31 days from order confirmation, depending on the quantity band and how much of the order is customised. Small quantities typically run 10 to 15 days and the larger bands 20 to 31 days; the band for a specific product is stated on its product page.

Nothing moves before the order is confirmed, so an enquiry that is still being compared does not hold a slot. That is deliberate: a held slot that is never used delays the order behind it.

What actually moves a date

Customisation. A custom size or a new colour is a production change rather than a stock pick, and it is priced and scheduled as one. The same applies to a non-standard surface pattern or a packaging change agreed late.

Third-party testing also sits at the end of the schedule. Where a project needs the report addressed to a named inspector or issued to a specific standard, agree it at the quotation stage — it cannot be added once production is finished.

  • Standard size, standard colour — the shorter band
  • Custom width, length, thickness or colour — production change
  • Buyer-specific packaging or labelling — scheduled as a separate step
  • Third-party test or inspector-addressed report — must be agreed at quotation

Terms and the port

FOB, CIF and DDP are quoted. Give us the destination port or the inland delivery address at the enquiry stage so the quotation is issued on the term that actually matches it — freight and import duty are then in the price you compare rather than discovered after the order.

We ship from Xingang, China. It is stated on the quotation together with the trade term, so an FOB price and a CIF price are both anchored to the same loading port and can be compared line for line.

Packed for the way it travels

Each mat roll is wrapped in moisture-proof film, then packed in a woven bag or on a fumigated wooden pallet so the roll does not deform or get scratched in transit. Roll dimensions and pallet counts are confirmed with the quotation, because they follow the sheet size you order.

Insulating gloves and smaller items travel as cartons on the same booking. Where several lines ship together, the packing list is built per line so a partial receipt can still be matched to the order.

One booking instead of four

Matting, gloves, earthing sets, detectors and cabinets can ship together on one set of documents and one freight booking. For a substation package that usually means one inspection point, one bill of lading and one arrival to plan labour around.

Enquiry checklist (A4, one page)

Ten fields, one page: product type, class or maximum service voltage, size, quantity, destination, trade term, documents, inspection and date. Fill it in and send it back — the quotation comes with price, MOQ, lead time and packing.

Download the checklist (PDF)
FAQ

Asked on this subject

Is the lead time counted in working days or calendar days?
Calendar days from order confirmation. The band that applies to a specific product is stated on its product page and confirmed on the quotation, because a custom dimension or a new colour is scheduled as a production change.
Can you hold goods while our site is not ready?
Storage after packing is agreed case by case in the contract rather than promised here. Tell us the required arrival window at the enquiry stage and the quotation is built around it.
Which documents travel with the shipment?
The commercial documents for the agreed trade term, plus the batch dielectric test report for the goods in the shipment. Where a project needs a third-party report or an inspector-addressed copy, that is arranged at quotation stage.